|
SEA2ICE Ltd. &
Co. KG
email: advice@sea2ice.com email: offshore@sea2ice.com February
2012 -ice sea-to-ice |
sea to ice SEA2ICE Ltd. & Co. KG provides
offshore and arctic solutions Advice & Consulting ·
Philosophies
for environmental protection ·
Analyzing
/ checking of new designs and concepts (working for operators or contractors)
considering operational, engineering, constructional and environmental
aspects ·
Design
philosophies for offshore structures in ice and open waters ·
Offshore
structures in ice and open waters: operational optimized concepts ·
Design
review: offshore wind park in ice covered waters ·
Design
review: offshore wind installation vessel ·
Offshore
structures in ice and open waters: operational optimized concepts ·
Offshore
wind energy converters in open waters and ice (foundation, installation,
operation & logistics) ·
Verification
and evaluation of original design philosophies ·
Design
evaluation of offshore vessels and concepts ·
Design
evaluation of jackup vessels ·
Sophisticated
innovative 4 leg jackup rig design (InnoRig) ·
Development
of global drilling and production concepts in ice ·
Offshore
structures for the North Caspian Sea (structures in shallow ice covered waters) ·
Drilling
rig concepts for the North Caspian Sea ·
Conceptual
studies for drilling rigs to be used in the North Caspian ·
Jackup
drilling rig concepts for ice covered waters (North Caspian Sea) ·
Ice
model tests ·
Offshore
and seakeeping model tests ·
Rescue
systems in ice and open waters ·
Environmental
loads, ice loads on structures ·
Alternative
drilling concepts: hybrid drilling concepts ·
Ice
barriers for shallow waters, ice rubble generators ·
Evaluation
of ice conditions and consequences for offshore wind energy converters ·
Environmental
loads, ice loads on structures ·
Ice
force analysis for winter operations ·
Ice
force studies for drilling rigs in the North Caspian ·
Overall
stability concept for drilling rig under special consideration of the
environmental loads: waves, wind, current, and ice forces ·
Rig
Moves with Parker Rig 257 (Sunkar)
in the North Caspian Sea: responsible for de-ballasting/de-grounding and
ballasting/grounding operation ·
Rig
move procedures ·
Operation
manuals ·
Floating
stability, ballast and weight calculations ·
Dead
weight surveys ·
Motion
analysis of offshore structures ·
Engineering
procedures (connecting units in floating mode) ·
Reliability,
availability and maintenance analyses (RAM) ·
Mooring
analysis and mooring layout of floating marina jetty ·
Development
of full-scale measurement system for the determination of ice, wave, wind and
current forces on offshore structures Workshops ·
Design
philosophies for offshore structures in ice considering operational,
engineering, construction and environmental aspects ·
Tailor
made ice & offshore concepts considering operational, engineering,
construction and environmental aspects ·
Offshore
wind concepts considering foundation, installation, logistics &
operational aspects ·
Operational
optimization of offshore concepts in ice and open waters (interdisciplinary
approach) ·
Awareness
of ice related “challenges” Short courses and lectures ·
ASME
Short Courses: Ice Engineering (8h credited) ·
Courses
for Companies: “Ice Engineering” ·
Lectures:
“Offshore Engineering” ·
Lectures:
“Ice Engineering” ·
Special
course: design philosophies for offshore structures in ice ·
Advisor
Offshore for Ship&Offshore Conferences ·
Business
Offshore Conference in Hamburg 2011
·
Arctic
Oil & Gas Conference in Oslo 2011 ·
Ocean,
Offshore and Arctic Conference in Rio de Janeiro OMAE 2012 ·
Arctic
Technology Conference ATC 2012 ·
Arctic
Oil & Gas North America conference in Houston 2011 ·
Bau, Installation und
Betrieb von Offshore-Energieanlagen 2011 Project Manager / Management ·
Engineering
Manager, North Caspian Project: responsible for engineering of the ice
classed drilling barge rig: Parker
Rig 257 ·
Rig
Upgrade Manager, North Caspian Project: responsible for upgrade construction
of Parker Rig 257 (Sunkar) ·
Negotiations
with clients |